Operator: Aker BP ASA
Field: Hod
Facility: Hod B
Other information:
Hod B is a normally unmanned installation (NUI). Use of the facility includes start-up, operation, maintenance, well operations and all associated activities.
The Petroleum Safety Authority Norway (PSA) has given Aker BP consent to use the Hod B facility.
Operator: Aker BP ASA
Field: Hod
Facility: Hod B
Other information:
Hod B is a normally unmanned installation (NUI). Use of the facility includes start-up, operation, maintenance, well operations and all associated activities.