Operator: Equinor Energy AS
Production licence: 043
Well: 30/4-A-11 and 30/4-A-16
Facility: Maersk Intrepid
Other information:
Maersk Intrepid has been on the Martin Linge field since the autumn of 2018, but has functioned as a floatel. The rig will remain at the same location during the drilling campaign.