Operator: Wintershall Dea
Production licence: 418
Facility: West Mira
Field: Nova
Duration: 388 days
Other info: The consent applies to drilling and completion on the Nova field using the West Mira mobile drilling facility. The facility is operated by Seadrill and received an Acknowledgement of Compliance (AoC) from the PSA in 2019.
Nova
Nova is a field in the northern part of the North Sea, 17 kilometres southwest of Gjøa field. The water depth in the area is 370 m. Nova was proven in 2012, and the plan for development and operation (PDO) was approved in September 2018. The planned development consists of two 4-slots subsea templates, one for oil production and one for water injection, each with three wells tied-back to the Gjøa platform.
Production started in 2022.
Source: norskpetroleum.no