Operator: Aker BP
Facility: Valhall IP
Start-up: Mid-April 2020
Duration: Around 4.5 months

Other info:

The IP Performinator project is an upgrade project in which existing pipe-handling equipment and control systems on the Valhall IP drilling module will be replaced with a robotic system. In addition, the existing drillers’ cabin will be removed and a new cabin installed in the office module at Valhall IP