Well 6406/3-10 is part of production licence 836 S, for which Wintershall Dea is the operator. The well has been given the prospect name of Bergknapp.
The geographical coordinates are:
- 64° 56' 16.19" N
- 06° 46' 42.63" E
Water depth at the site is 312 metres.
Drilling starts in November 2019 and is expected to last 59 days.
Well 6406/3-10 will be drilled by the West Mira mobile drilling facility.
West Mira is a semi-submersible facility of the Moss CS60 design. It will be operated by Seadrill Europa Management AS.
West Mira received an Acknowledgement of Compliance (AoC) from the PSA in November 2019.