Well 6406/3-10 is part of production licence 836 S, for which Wintershall Dea is the operator. The well has been given the prospect name of Bergknapp.

The geographical coordinates are:

  • 64° 56' 16.19" N
  • 06° 46' 42.63" E

Water depth at the site is 312 metres.

Drilling starts in November 2019 and is expected to last 59 days.

Well 6406/3-10 will be drilled by the West Mira mobile drilling facility.

West Mira is a semi-submersible facility of the Moss CS60 design. It is owned by Northern Drilling and will be operated by Seadrill Europa Management AS.

West Mira received an Acknowledgement of Compliance (AoC) from the PSA in November 2019.