Well 6406/3-10 is part of production licence 836 S, for which Wintershall Dea is the operator. The well has been given the prospect name of Bergknapp.

The geographical coordinates are:

  • 64° 56' 16.19" N
  • 06° 46' 42.63" E

Water depth at the site is 312 metres.

Drilling starts in November 2019 and is expected to last 59 days.

Well 6406/3-10 will be drilled by the West Mira mobile drilling facility.

West Mira is a semi-submersible facility of the Moss CS60 design. It will be operated by Seadrill Europa Management AS.

West Mira received an Acknowledgement of Compliance (AoC) from the PSA in November 2019.