P1 is the third of four platforms to be installed at the Johan Sverdrup field centre (phase one). Production start-up is planned for Q4 2019. The various facilities and installations for phase one are being prepared and completed for use in the period from Q2 2018 to Q4 2019.

imagebnct.png

Johan Sverdrup

Johan Sverdrup is a field on the Utsira High in the central part of the North Sea, 65 kilometres northeast of the Sleipner fields. The water depth in the area is 110-120 metres. Johan Sverdrup was discovered in 2010 and the plan for development and operation (PDO) for Phase I was approved in 2015. The development solution for the first development phase is a field centre with four specialised platforms: living quarters, process, drilling and riser facilities. Production started in 2019.

The PDO for Phase II was approved in 2019. The development solution comprises a process platform and five subsea templates. Production from phase II started in 2022.

Source: norskpetroleum.no