The audit was conducted on 18 April 2023.
Objective
The objective of the audit was to obtain an overview of the technical condition and integrity of the pipeline systems, and to verify that their operation complies with the requirements in the HSE regulations.
Result
No non-conformities or improvement points were identified during the audit.