The audit was carried out in the period 23 November to 8 December 2021.

Objective

The objective of the audit was to verify that the integrity of structures and maritime systems during the extended operational period is being safeguarded in accordance with the requirements of the HSE regulations.

Result

We identified two non-conformities, concerning:

  • Documentation of windows exposed to green water
  • Documentation that the Jotun FPSO can maintain its position at all times

We also observed four factors that we have chosen to categorize as improvement points. These concerned:

  • Investigation of the condition of removed anchoring components
  • Process for assessing new standards
  • Identification of information needed to plan and execute activities
  • Choice of curves for fatigue calculations

What happens now?

We have asked Vår Energi to report by 28 January 2022 on how the non-conformities will be addressed and for their assessment of the improvement points observed.