The audit was conducted on 4 and 5 March 2020. Planned verifications and interviews offshore on the Edvard Grieg facility in the period 10 to 12 March 2020 were not carried out due to restrictions resulting from the coronavirus.

Objective

The objective of the audit was to verify that the integrity of structures was being safeguarded in accordance with the HSE regulations.

Result

No regulatory non-conformities were identified during the audit.

Three improvement points were identified, relating to:

  • Design assumptions
  • Condition monitoring
  • Deficient follow-up of suppliers

What happens next?

We have asked Lundin for an assessment of the improvement points observed.