The audit was conducted between 25 and 27 September 2019.

Background

Equinor has discovered weaknesses in the light fixtures on the Johan Sverdrup field. In a meeting of 3 September 2019, we were informed of measures that the company had implemented. In the audit, these measures were verified and followed up.

Objective

The objective of the notified activity included verifying Equinor’s management and follow-up of safe and robust solutions, especially as concerns the integrity of light fixtures on the facilities.

Result

In the audit, we identified one regulatory non-conformity. This concerned the installation and commissioning of temporary lighting and a loudspeaker system. One improvement point was also identified relating to the maintenance programme and procedures for permanent and temporary lighting.

What happens now?

We have asked Equinor to report by 8 November 2019 on how the non-conformity will be addressed and for their assessment of the improvement point.