Objective

The objective of the audit was to assess how Neptune Energy:

  • is ensuring compliance with regulatory requirements relating to barrier management at Gjøa.
  • has followed up identified measures following the condensate leak incident of 21 June 2017.

Result

Non-conformities were identified relating to:

  • The fire water system
  • Procedure for fracture calculations
  • Passive fire protection
  • Updated analyses and assessments

In addition, improvement points were identified in connection with:

  • Inspection of penetrations in fire walls
  • Governing documentation
  • Labelling of equipment

What happens now?

Neptune Energy has been given a deadline of 17 June 2019 to report on how the non-conformities and improvement points will be addressed.