The audit was conducted from 21 to 24 November 2016.

Objective

The objective of the audit was to verify compliance with the company’s own requirements and those of the authorities in respect of operational, administrative and technical conditions pertaining to Lundin’s management of logistics and arrangements for materials handling, cranes and lifting at Edvard Grieg.

Result

Two non-conformities were identified in connection with:

  • Materials handling
  • Documentation and labelling

In addition, an improvement point was observed concerning a technical condition.

What happens next?

We have asked Lundin to report on how the non-conformities will be addressed. We have also requested an assessment of the improvement point observed.

The reply deadline is set at 1 February 2017.