Objective

The objective of the audit was to assess how Norske Shell (Shell) is monitoring and organising the prudent planning and performance of the scaffolding work.

Result

Non-conformities were identified in connection with:

  • Checking of scaffolding
  • Training
  • The supervisory duty
  • The safety service

No improvement points were identified.

Shell has been given a deadline of 7 August 2015 to report on how the non-conformities will be dealt with.

Non-conformity:

Entails that a condition is assessed as not complying with a regulatory requirement.

Improvement point:

Entails that we have identified a deficiency or weakness, without there being sufficient grounds for determining a breach of regulatory requirements.