Objective
The objective of the audit was to assess how Norske Shell (Shell) is monitoring and organising the prudent planning and performance of the scaffolding work.
Result
Non-conformities were identified in connection with:
- Checking of scaffolding
- Training
- The supervisory duty
- The safety service
No improvement points were identified.
Shell has been given a deadline of 7 August 2015 to report on how the non-conformities will be dealt with.
Non-conformity:
Entails that a condition is assessed as not complying with a regulatory requirement.
Improvement point:
Entails that we have identified a deficiency or weakness, without there being sufficient grounds for determining a breach of regulatory requirements.