Objective

The objective of the audit was to assess whether Det norske is implementing the HSE regulations and its own requirements for pipeline fabrication.

Result

No non-conformities were identified.

Three improvement points were identified in connection with:

  • Documentation
  • Qualifications and competence
  • Follow-up

Det norske has been given a deadline of 10 July 2015 to report on how the improvement points will be dealt with.

Non-conformity:

Entails that a condition is assessed as not complying with a regulatory requirement.

Improvement point:

Entails that we have identified a deficiency or weakness, without there being sufficient grounds for determining a breach of regulatory requirements.