EkoJ is a processing platform which receives production from the entire Ekofisk field in addition to Eldfisk and Tor for processing and transport to Emden/Teeside. EkoJ is part of the Ekofisk complex and has a bridge connection to Ekofisk 2/4M and Ekofisk 2/4X.
Result
Five non-conformities were identified in connection with:
- Barrier management
- High-voltage installations
- Management of non-conformities
- Pressure tanks
- Documentation
In addition, improvement points were identified in connection with:
- Fire water
- Process shutdown valve
- Ignition sources
- Evacuation routes
- Acceptance criteria