Objective

The objective of the activity was to audit Statoil's own management system for ensuring compliance with the regulatory requirements for risk and barrier management from a life-cycle perspective. It was of particular importance to elucidate how the company has assessed the relationship between risk and hazard assessments, the need for barriers and the barriers' role specifically on the Gina Krog installation.

Result

Non-conformities were identified in connection with:

  • Fire design loads
  • The fire water system

In addition, improvement points were identified in connection with:

  • Risk management
  • Barrier management system
  • Fire divisions
  • Partitioning and pressure relief
  • Ignition source control and ATEX
  • Vulnerability analysis
  • Classification
  • Fire resistance of deck grating