What are you looking for?
353 hits in Complete website
Filters
Subjects
Year
Selected filters
-
How to define "Worst Credible Process Fire"?Published:Credible Process Fire"? Sintef has been commissioned by the Petroleum Safety Authority Norway to perform a mapping and assessment of how the industry defines "Worst Credible Process Fire". Sintef has been
- Project report
- Process safety
-
PSA investigates fire at Snorre BPublished:launched an investigation into a fire which broke out on the Snorre B facility on 1 May 2019. The Petroleum Safety Authority Norway (PSA) has launched an investigation into a fire which broke out on the Snorre
- News
- Process safety
- Working environment
-
Seadrill - West Phoenix - Investigation into firePublished:Seadrill - West Phoenix - Investigation into fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of the fire in the mud laboratory on West Phoenix of 5 November 2018. Several
- Investigation report
- Electrical installations
- Emergency preparedness
- West Phoenix
-
Equinor – Tjeldbergodden – investigation of turbine breakdown and firePublished:Tjeldbergodden – investigation of turbine breakdown and fire The PSA has completed its investigation of the incident involving a turbine breakdown with subsequent fire in the methanol plant at Tjeldbergodden. Serious
- Video
- Process safety
- Barrier management
- Risk management
-
Saipem - Scarabeo 5 - Investigation of firePublished:Investigation of fire The PSA has completed its investigation of the fire which broke out on the mobile unit Scarabeo 5 during 22 November 2016. The PSA has completed its investigation of the fire which broke
- Investigation report
- Handling, cranes and lifting
- Process safety
- Scarabeo 5
- Saipem
-
Statoil - Statfjord A - Investigation of firePublished:Statoil - Statfjord A - Investigation of fire The PSA has completed its investigation of the fire which broke out in the utility shaft on Statfjord A on 16 October 2016. Breaches of the regulations have
- Investigation report
- Emergency preparedness
- Electrical installations
- Structural safety
- Technical safety
- Maintenance management
- Statoil
- Statfjord A
- Statoil
- Statfjord A
-
Equinor – Åsgard B – investigation of incident with firePublished:– Åsgard B – investigation of incident with fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of an incident involving a fire in a high-voltage transformer on the Åsgard
- Investigation report
- Electrical installations
- Technical safety
- Emergency preparedness
- Equinor
- Åsgard B
-
Teekay Petrojarl Production - Petrojarl Knarr - Investigation of firePublished:Petrojarl Production - Petrojarl Knarr - Investigation of fire The Petroleum Safety Authority Norway (PSA) has completed its investigation of a fire on Petrojarl Knarr during 24 March 2015. A number of breaches
- Investigation report
- Emergency preparedness
- Process safety
- Petrojarl Knarr
- Teekay
-
Equinor – Johan Sverdrup – technical safety, fire insulation, handling of corrosion under insulation and environmental dataPublished:– Johan Sverdrup – technical safety, fire insulation, handling of corrosion under insulation and environmental data Equinor – Johan Sverdrup – technical safety, fire insulation, handling of corrosion under
- Inspection report
- Structural safety
- Technical safety
- Equinor
- Johan Sverdrup
-
Order to Equinor – Sleipner A – investigation of incident with short circuit and fire pump breakdownPublished:investigation of incident with short circuit and fire pump breakdown Order to Equinor – Sleipner A – investigation of incident with short circuit and fire pump breakdown The Petroleum Safety Authority Norway
- Investigation report
- Emergency preparedness
- Process safety
- Technical safety
- Sleipner
- Equinor
-
Order to Equinor - Tjeldbergodden - investigation of turbine breakdown and firePublished:– Tjeldbergodden – investigation of turbine breakdown and fire Order to Equinor - Tjeldbergodden - investigation of turbine breakdown and fire The Petroleum Safety Authority Norway (PSA) has completed
- Investigation report
- Process safety
- Technical safety
- Maintenance management
- Emergency preparedness
- Working environment
- Equinor
- Tjeldbergodden
-
Series of accidents arouse concernPublished:Johan Castberg project Valaris - Rowan Stavanger - BOP, component came loose Equinor - Hammerfest LNG - turbine fire Neptune/Odfjell - Gjøa - well control incident Seadrill - West Bollsta - dropped object
- News
-
Eni Norge - Goliat FPSO - Technical and operational barriersPublished:operational organisation at Hammerfest. On 7 and 8 May 2015, the Petroleum Safety Authority Norway carried out an audit of Eni Norge (Eni)'s operational organisation at Hammerfest. The objective of the audit
- Inspection report
- Barrier management
- Eni Norge
- Goliat FPSO
-
Re § 36 Firewater supplynecessary to supply all fire-fighting equipment in the onshore facility's largest fire area with one fire pump out of operation and necessary additional capacity to ensure that the fire does not spread to other
- Guideline
- Technical and operational regulations
-
2010s: Hot and cold in the far northPublished:capacity at Hammerfest LNG. “Gas pipeline operator Gassco is now assessing opportunities for and the consequences of expanding such exports, both via the pipeline system to Europe and by increasing LNG capacity
- Feature
- Emergency preparedness
- Risk management
-
§ 36 Firewater supplycombat fires and prevent spreading. The firewater system shall be designed such that a pressure stroke does not make all or part of the system inoperative. It shall be possible to activate fire pumps manually
- Paragraph
- Technical and operational regulations
-
§ 36 Firewater supplyof firewater to combat fires and suppress gas explosions if this can result in lower explosion pressure, cf. Section 37. Manned facilities shall have firewater supply from fire pumps or other independent
- Paragraph
- The facilities regulations
-
§ 16 Drainage systemshall be equipped with drainage systems that can collect and divert liquids to reduce the risk of fire, harm to personnel and pollution. 612-1033-F2024_1-16
- Paragraph
- Technical and operational regulations
-
Re § 3 Definitionsplant tank area pipe trenches flares control rooms manned buildings in general (workshop, laboratory, fire station, administration buildings) unmanned buildings (substations, analyser buildings, warehouses)
- Guideline
- Technical and operational regulations
-
Re § 33 Emergency shutdown systemcompartmentalise the fire areas on the facility means, inter alia, that a sufficient number of sectionalising valves shall be installed in the processing facility to ensure that any fire load in the event
- Guideline
- The facilities regulations