Havtil investigates Mongstad firePublished:Havtil investigates Mongstad fire The Norwegian Ocean Industry Authority (Havtil) has launched an investigation into a short-circuit with subsequent fire and smoke development in a substation at Mongstad
- News
- Process safety
- Working environment
-
Statoil - Co-location of office facilities on Melkøya for Hammerfest LNG.Published:for Hammerfest LNG. Statoil - Co-location of office facilities on Melkøya for Hammerfest LNG. Statoil has received consent for the co-location of office facilities on Melkøya for Hammerfest LNG. Statoil
- Consent
- Operations, maintenance, modifications
-
Equinor – Hammerfest LNG – alarm load and workload in control room, and working hoursPublished:Equinor – Hammerfest LNG – alarm load and workload in control room, and working hours The Petroleum Safety Authority Norway (PSA) has carried out an audit of Equinor focused on alarm load and workload
- Inspection report
- Equinor
- Melkøya
-
Equinor – Hammerfest LNG – major accident audit and audit of start-up preparationsPublished:Equinor – Hammerfest LNG – major accident audit and audit of start-up preparations The Petroleum Safety Authority Norway (PSA) has carried out a major accident audit and an audit of Equinor’s start-up
- Inspection report
- Process safety
- Equinor
- Melkøya
-
Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulationPublished:Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulation Statoil - Hammerfest LNG - Control systems and surface maintenance – corrosion under insulation On 1 and
- Inspection report
- Maintenance management
- Statoil
- Melkøya
-
Equinor - Hammerfest LNG - Order after investigation of hydrates in safety valvesPublished:Equinor - Hammerfest LNG - Order after investigation of hydrates in safety valves The Petroleum Safety Authority Norway (PSA) resolved in March 2019 to investigate an incident at Equinor’s Hammerfest LNG (HLNG)
- Investigation report
- Barrier management
- Technical safety
- Working environment
- Equinor
- Melkøya
-
Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilitiesPublished:Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilities Statoil - Hammerfest LNG - Major accident audit and an audit of electrical facilities We have carried out a major accident
- Inspection report
- Process safety
- Emergency preparedness
- Electrical installations
- Statoil
- Melkøya
-
Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control roomPublished:Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control room Equinor - Hammerfest LNG - The follow-up of alarm load and human factors in the control room From 14 to 16 May
- Inspection report
- Working environment
- Process safety
- Melkøya
- Equinor
- Statoil
-
Re § 30 Fire divisionsFire divisions 30 For fire divisions in living quarters, see Section 31. For determination of fire and explosion loads as mentioned in the first and second subsections, see Section 11. Worst credible
- Guideline
- The facilities regulations
-
§ 31 Fire divisionsFire divisions 31 The main areas of onshore facilities shall be separated so that they can withstand the design fire and explosion loads. Rooms and other defined areas with important functions and important
- Paragraph
- Technical and operational regulations
-
§ 30 Passive fire protectionPassive fire protection 30 Where passive fire protection is used, this shall be designed such that it provides relevant structures and equipment with sufficient fire resistance as regards load capacity
- Paragraph
- Technical and operational regulations
-
Re § 31 Fire divisionsFire divisions 31 Fire divisions with coated or sprayed-on fire protection material that does not fulfil the requirements for incombustibility, can be used if an overall assessment indicates that this
- Guideline
- Technical and operational regulations
-
§ 30 Fire divisionsFire divisions 30 Main areas and fire areas on facilities shall be separated by fire divisions that can withstand the design loads for fire and explosion. If the fire divisions may be exposed to hydrocarbon
- Paragraph
- The facilities regulations
-
§ 29 Passive fire protectionPassive fire protection 29 Where passive fire protection is used, this shall be designed such that it provides relevant structures and equipment with sufficient fire resistance as regards load capacity
- Paragraph
- The facilities regulations
-
Re § 30 Passive fire protectionPassive fire protection 30 As regards stipulation of fire loads as mentioned in the first subsection, see Section 6, litera a. To determine fire resistance, the test methods in the standards ISO 834
- Guideline
- Technical and operational regulations
-
Re § 29 Passive fire protectionPassive fire protection 29 For determination of fire loads according to the first subsection, see Section 11. Adequate fire resistance as mentioned in the first subsection, should be determined in relation
- Guideline
- The facilities regulations
-
§ 37 Fixed fire-fighting systemsFixed fire-fighting systems 37 Fixed fire-fighting systems shall be installed in explosion-hazard areas and in areas with a major risk of fire. The systems shall also cover equipment containing significant
- Paragraph
- The facilities regulations
-
Re § 37 Fire-fighting equipment and systems for fire-fightingFire-fighting equipment and systems for fire-fighting 37 To fulfil the requirement for fixed fire-fighting installations as mentioned in the first subsection, Chapter 12 of the NS-EN ISO 13702 standard
- Guideline
- Technical and operational regulations
-
§ 37 Fire-fighting equipment and systems for fire-fightingFire-fighting equipment and systems for fire-fighting 37 Installation of fixed fire-fighting installations shall be based on a risk assessment. Onshore facilities shall be equipped with sufficient manual
- Paragraph
- Technical and operational regulations
-
Re § 32 Fire and gas detection systemFire and gas detection system 32 As regards the design of the system as mentioned in the first subsection, Chapter 11 of the NS-EN ISO 13702 standard as well as Attachment B.6 should be used. The requirement
- Guideline
- Technical and operational regulations