§ 39 Installation and commissioning

During installation of land facilities and parts thereof, it shall be ensured that the loads they are exposed to, do not exceed the design load limit.
When commissioning land facilities, it shall be ensured that they satisfy the requirements in Chapter II of these regulations regarding requirements for designing onshore facilities and parts thereof, see also Section 23 of the Framework Regulations. The technical condition of installations, systems and equipment shall be maintained until the facilities, systems and equipment are put into service.
Section last changed: 01 January 2011

Commissioning as mentioned in the second subsection entails e.g. that safety systems shall be function tested and verified. In order to fulfil the requirement, the NORSOK R-005 standard Annex H should be used for lifting equipment.