The TOGI facility is part of production licence 085 and is located south of Troll Øst in block 31/6.
The consent relates to removal of the actual TOGI template structure and will consist of the following main measures:
- Mobilisation of Saipem’s heavy lifting vessel ”SSCV S7000”
- Lifting from the seabed and towing the template from block 31/6 to an onshore facility at Leirvik on Stord, via Bømlafjorden
- Cleaning the seabed after removing the template
The TOGI facility’s position is:
- 67° 15' 717.3" North
- 53° 60' 43.8" East
Water depth at the site is 302 metres.
The activity is scheduled to be carried out in July-August 2012.

TOGI is a subsea facility for up to six wells, of which five wells have been installed. The facility delivered gas from the Troll field for injection in Oseberg, via a 48-km long 20” pipeline, from 1991 up to 2002.
Letter to Statoil Petroleum AS (In Norwegian)
Journal 2012/607