On 7 November 2017, we carried out an audit of Statoil and its planned adoption of insulation requirements for avoiding corrosion under insulation (CUI) in Johan Sverdrup phase 2.


Johan Sverdrup is an oil and gas field under development on the Utsira High in the North Sea, around 160 kilometres west of Stavanger. Water depth in the area is 110 to 120 metres.

Statoil is the field's operator. Production is scheduled to start in late 2019.

Objective
The objective of the audit was to investigate compliance with the regulatory requirements for insulation and potential future problems with corrosion under insulation.

Result
During the audit, we made observations relating to:

The project is in the planning (FEED) phase and a decision on implementing and submitting a plan for development and operation (PDO) is scheduled for Autumn 2018.

The phase 2 development is a planned necessary continuation of Johan Sverdrup phase 1 and consists of a processing facility and major modifications to the riser facility that include a development for power from onshore. Production start for phase 2 is scheduled for 2022. The field has an estimated lifetime of 50 years.